Wenquanbao
Download PDF data sheet
Particulars
Owner: unknown
Designer: Institute of Investigation and Design of Water Conservancy and Hydropower
Contractor: Hebei Construction Bureau
Statistics
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 7 m3x106
Height: 48 metres
Length: 188 metres
Volume of RCC: 55 m3x103
Total volume: 63 m3x103
Construction Dates
Start of Project: 10/91 (October 1991)
Start of RCC: 10/92 (October 1992)
End of RCC: 06/94 (June 1994)
End of Project: —/95 (— 1995)
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.30 | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
69 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
68 | Low-lime flyash (ASTM Class F) |
85 |