Xibingxi
 Download PDF data sheet
Xibingxi completed 

Particulars
Owner: unknown
Designer: Department of Water Conservancy, Qinghua University
Contractor: Gezhouba Construction Bureau
Statistics
Type: Arch-Gravity
Purpose(s): Hydropower / Water Supply
Reservoir capacity: 9 m3x106
Height: 64 metres
Length: 93 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Dates
Start of Project: 08/93 (August 1993)
Start of RCC: 12/94 (December 1994)
End of RCC: 07/95 (July 1995)
End of Project: 10/95 (October 1995)
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | RCC against formwork with external geomembrane | 
| 0.08 | RCC against formwork with external geomembrane | 
Downstream
| Slope | Type | 
|---|---|
| 0.65 | RCC against formwork | 
Spillway
| Slope | Type | 
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements | 
| 0.65 | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 - | 300 - | 
| 350 | 350 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 80 | 
| 79 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 120 | Low-lime flyash (ASTM Class F) | 
| 105 | 