Xibingxi

Download PDF data sheet
Xibingxi completed
Xibingxi completed

Particulars

Owner: unknown

Designer: Department of Water Conservancy, Qinghua University

Contractor: Gezhouba Construction Bureau

Statistics

Type: Arch-Gravity

Purpose(s): Hydropower / Water Supply

Reservoir capacity: 9 m3x106

Height: 64 metres

Length: 93 metres

Volume of RCC: 25 m3x103

Total volume: 33 m3x103

Construction Dates

Start of Project: 08/93 (August 1993)

Start of RCC: 12/94 (December 1994)

End of RCC: 07/95 (July 1995)

End of Project: 10/95 (October 1995)

Country: China

River: Longshanxi

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork with external geomembrane
0.08RCC against formwork with external geomembrane

Downstream

SlopeType
0.65RCC against formwork

Spillway

SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements
0.65 

Placement

Layers (mm)Lifts (mm)
300  -300  -
350350

Cementitious material

Cement (kg/m3)
80
79
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
105