Yunkou

Download PDF data sheet
Yunkou completed
Yunkou completed

Particulars

Owner: unknown

Designer: Hubei Institute of Investigation and Design of Water Resources and Hydropower

Contractor: SinoHydro Construction Bureau Nº15 Co. Ltd.

Statistics

Type: Thin Arch

Purpose(s): Hydropower

Reservoir capacity: 35 m3x106

Height: 119 metres

Length: 152 metres

Volume of RCC: 200 m3x103

Total volume: 205 m3x103

Construction Dates

Start of Project: 06/07 (June 2007)

Start of RCC: 04/08 (April 2008)

End of RCC: 06/09 (June 2009)

End of Project: /12 ( 2012)

Country: China

River: Wuni

DMS Co-ordinates: unknown

DD Co-ordinates: ,