Yunkou
Download PDF data sheet
Particulars
Owner: unknown
Designer: Hubei Institute of Investigation and Design of Water Resources and Hydropower
Contractor: SinoHydro Construction Bureau Nº15 Co. Ltd.
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 35 m3x106
Height: 119 metres
Length: 152 metres
Volume of RCC: 200 m3x103
Total volume: 205 m3x103
Construction Dates
Start of Project: 06/07 (June 2007)
Start of RCC: 04/08 (April 2008)
End of RCC: 06/09 (June 2009)
End of Project: —/12 (— 2012)