Yunlonghe Nº3
Download PDF data sheet
Particulars
Owner: unknown
Designer: Changjiang Investigation, Programming and Design Institute
Contractor: Gezhouba Constrution Group Corporation
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 44 m3x106
Height: 139 metres
Length: 119 metres
Volume of RCC: 182 m3x103
Total volume: 207 m3x103
Construction Dates
Start of Project: 03/06 (March 2006)
Start of RCC: 04/07 (April 2007)
End of RCC: 04/09 (April 2009)
End of Project: —/11 (— 2011)