SEARCHING
... please wait

Zhouning

Download PDF data sheet
Zhouning completed
Zhouning completed

Particulars

Owner: unknown

Designer: Fujian Institute of Investigation, Design and Research for Hydropower Projects, Fuzhou City

Contractor: Fujian (Minjiang) Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 47 m3x106

Height: 73 metres

Length: 206 metres

Volume of RCC: 159 m3x103

Total volume: 199 m3x103

Construction Dates

Start of Project: /02 ( 2002)

Start of RCC: 04/03 (April 2003)

End of RCC: 03/04 (March 2004)

End of Project: 06/04 (June 2004)

Country: China

River: Muyangxi

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.72RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
67
50
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
92