Bogovina
 Download PDF data sheet
Bogovina completed 

Particulars
Owner: unknown
Designer: Jaroslav Cemi Institute, Belgrade
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 48 m3x106
Height: 54 metres
Length: 396 metres
Volume of RCC: 175 m3x103
Total volume: 305 m3x103
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/14 (— 2014)
End of RCC: —/15 (— 2015)
End of Project: —/16 (— 2016)
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

