SEARCHING
... please wait

Bogovina

Download PDF data sheet
Bogovina completed
Bogovina completed

Particulars

Owner: unknown

Designer: Jaroslav Cemi Institute, Belgrade

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

Reservoir capacity: 48 m3x106

Height: 54 metres

Length: 396 metres

Volume of RCC: 175 m3x103

Total volume: 305 m3x103

Construction Dates

Start of Project: /12 ( 2012)

Start of RCC: /14 ( 2014)

End of RCC: /15 ( 2015)

End of Project: /16 ( 2016)

Country: Serbia

River: Cmi Timok

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type