Fenhe Nº2
 Download PDF data sheet
Fenhe Nº2 completed 

Particulars
Owner: unknown
Designer: Shanxi Institute of Investigation and Design of Water Conservancy
Contractor: Shanxi Construction Bureau
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
Reservoir capacity: 130 m3x106
Height: 87 metres
Length: 350 metres
Volume of RCC: 362 m3x103
Total volume: 448 m3x103
Construction Dates
Start of Project: 11/96 (November 1996)
Start of RCC: 08/98 (August 1998)
End of RCC: 03/99 (March 1999)
End of Project: 06/00 (June 2000)
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against formwork | 
| 0.20 | Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| 0.75 | Traditional concrete against precast concrete panels | 
Spillway
| Slope | Type | 
|---|---|
| 0.75 | Traditional concrete against formwork | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 3000 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 127 | 
| 60 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 84 | Low-lime flyash (ASTM Class F) | 
| 93 | 

