Hatta Upper Saddle
 Download PDF data sheet
Hatta Upper Saddle completed 

Particulars
Owner: unknown
Designer: Artelia
Contractor: Strabag-Ozkar JV
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 38 metres
Length: 184 metres
Volume of RCC: 41 m3x103
Total volume: 45 m3x103
Construction Dates
Start of Project: 12/19 (December 2019)
Start of RCC: 03/21 (March 2021)
End of RCC: 09/21 (September 2021)
End of Project: —/24 (— 2024)
Country: UAE
River: unknown
DMS Co-ordinates: 24˚45'56"N, 56˚6'37"E
DD Co-ordinates: 24.765556, 56.110279
Facings
Upstream
| Slope | Type | 
|---|---|
| RCC against precast concrete panels | 
Downstream
| Slope | Type | 
|---|---|
| RCC against precast concrete panels | 
Spillway
| Slope | Type | 
|---|---|
| RCC against precast concrete panels [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 65 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 120 | Low-lime flyash (ASTM Class F) | 

