Hatta Upper Saddle
Download PDF data sheet
Particulars
Owner: unknown
Designer: Artelia
Contractor: Strabag-Ozkar JV
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 38 metres
Length: 184 metres
Volume of RCC: 41 m3x103
Total volume: 45 m3x103
Construction Dates
Start of Project: 12/19 (December 2019)
Start of RCC: 03/21 (March 2021)
End of RCC: 09/21 (September 2021)
End of Project: —/24 (— 2024)
Country: UAE
River: unknown
DMS Co-ordinates: 24˚45'56"N, 56˚6'37"E
DD Co-ordinates: 24.765556, 56.110279
Facings
Upstream
Slope | Type |
---|---|
RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
RCC against precast concrete panels |
Spillway
Slope | Type |
---|---|
RCC against precast concrete panels [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |