Ntabalanga
Download PDF data sheet
Particulars
Owner: unknown
Designer: Department of Water & Sanitation
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: unknown
Height: 75 metres
Length: 240 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 09/19 (September 2019)
Start of RCC: 07/22 (July 2022)
End of RCC: 10/24 (October 2024)
End of Project: 05/25 (May 2025)
Country: South Africa
River: Itsitsa
DMS Co-ordinates: 31˚07'3.68"S, 28˚40'19.48"E
DD Co-ordinates: -31.117689, 28.672077
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|