SEARCHING
... please wait

Ntabalanga

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: Department of Water & Sanitation

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Irrigation / Water Supply

Reservoir capacity: unknown

Height: 75 metres

Length: 240 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: 09/19 (September 2019)

Start of RCC: 07/22 (July 2022)

End of RCC: 10/24 (October 2024)

End of Project: 05/25 (May 2025)

Country: South Africa

River: Itsitsa

DMS Co-ordinates: 31˚07'3.68"S, 28˚40'19.48"E

DD Co-ordinates: -31.117689, 28.672077

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type