Ntabalanga
 Download PDF data sheet
Photo coming soon 

Particulars
Owner: unknown
Designer: Department of Water & Sanitation
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: unknown
Height: 75 metres
Length: 240 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 09/19 (September 2019)
Start of RCC: 07/22 (July 2022)
End of RCC: 10/24 (October 2024)
End of Project: 05/25 (May 2025)
Country: South Africa
River: Itsitsa
DMS Co-ordinates: 31˚07'3.68"S, 28˚40'19.48"E
DD Co-ordinates: -31.117689, 28.672077
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|