Shankou Nº3
 Download PDF data sheet
Photo coming soon 

Particulars
Owner: unknown
Designer: Investigation and design Institute of Water Resources, Guangdong Province
Contractor: Construction Bureau Guangdong Province 2nd Sector
Statistics
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
Reservoir capacity: 48 m3x106
Height: 57 metres
Length: 179 metres
Volume of RCC: 90 m3x103
Total volume: 119 m3x103
Construction Dates
Start of Project: 09/99 (September 1999)
Start of RCC: 02/00 (February 2000)
End of RCC: 01/01 (January 2001)
End of Project: 03/01 (March 2001)
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) | 
Downstream
| Slope | Type | 
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) | 
Spillway
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 330 | 3000 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 105 | 
| 63 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 86 | Low-lime flyash (ASTM Class F) | 
| 80 | 
