SEARCHING
... please wait

Shankou Nº3

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: Investigation and design Institute of Water Resources, Guangdong Province

Contractor: Construction Bureau Guangdong Province 2nd Sector

Statistics

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

Reservoir capacity: 48 m3x106

Height: 57 metres

Length: 179 metres

Volume of RCC: 90 m3x103

Total volume: 119 m3x103

Construction Dates

Start of Project: 09/99 (September 1999)

Start of RCC: 02/00 (February 2000)

End of RCC: 01/01 (January 2001)

End of Project: 03/01 (March 2001)

Country: China

River: Du’anshui (Chengjiang)

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3303000

Cementitious material

Cement (kg/m3)
105
63
Pozzolan (kg/m3)Pozzolan Type
86Low-lime flyash (ASTM Class F)
80