Shankou Nº3
Download PDF data sheet
Particulars
Owner: unknown
Designer: Investigation and design Institute of Water Resources, Guangdong Province
Contractor: Construction Bureau Guangdong Province 2nd Sector
Statistics
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
Reservoir capacity: 48 m3x106
Height: 57 metres
Length: 179 metres
Volume of RCC: 90 m3x103
Total volume: 119 m3x103
Construction Dates
Start of Project: 09/99 (September 1999)
Start of RCC: 02/00 (February 2000)
End of RCC: 01/01 (January 2001)
End of Project: 03/01 (March 2001)
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
105 |
63 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
86 | Low-lime flyash (ASTM Class F) |
80 |