Shannipo
 Download PDF data sheet
Shannipo completed 

Particulars
Owner: unknown
Designer: Guiyang Hydropower Investigation, Design and Research Institute, CHECC
Contractor: unknown
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 85 m3x106
Height: 119 metres
Length: 205 metres
Volume of RCC: 199 m3x103
Total volume: 267 m3x103
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/11 (— 2011)
End of RCC: —/13 (— 2013)
End of Project: —/15 (— 2015)
Facings
Upstream
| Slope | Type | 
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) | 
Downstream
| Slope | Type | 
|---|---|
| curve | RCC against formwork | 
Spillway
| Slope | Type | 
|---|---|
| ogee | RCC against formwork | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|