SEARCHING
... please wait

Zhaolaihe

Download PDF data sheet
Zhaolaihe completed
Zhaolaihe completed

Particulars

Owner: unknown

Designer: Hubei Institute of Investigation and Design of Water Resources and Hydropower

Contractor: 11th Construction Bureau

Statistics

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

Reservoir capacity: 70 m3x106

Height: 107 metres

Length: 206 metres

Volume of RCC: 166 m3x103

Total volume: 255 m3x103

Construction Dates

Start of Project: 12/03 (December 2003)

Start of RCC: 03/04 (March 2004)

End of RCC: 05/05 (May 2005)

End of Project: 10/05 (October 2005)

Country: China

River: Sidu

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
curveRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
curveRCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
84
126
Pozzolan (kg/m3)Pozzolan Type
126Low-lime flyash (ASTM Class F)
103