SEARCHING
... please wait

Maojiang

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: Institute of Hydropower Design, Rongzhou City

Contractor: Headquarters of Water Resources and Civil Engineering, Lanshan City

Statistics

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

Reservoir capacity: 2 m3x106

Height: 45 metres

Length: 150 metres

Volume of RCC: unknown

Total volume: 45 m3x103

Construction Dates

Start of Project: /92 ( 1992)

Start of RCC: /93 ( 1993)

End of RCC: /94 ( 1994)

End of Project: /95 ( 1995)

Country: China

River: Xiang

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)