Maojiang
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Institute of Hydropower Design, Rongzhou City
Contractor: Headquarters of Water Resources and Civil Engineering, Lanshan City
Statistics
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 2 m3x106
Height: 45 metres
Length: 150 metres
Volume of RCC: unknown
Total volume: 45 m3x103
Construction Dates
Start of Project: —/92 (— 1992)
Start of RCC: —/93 (— 1993)
End of RCC: —/94 (— 1994)
End of Project: —/95 (— 1995)