Maojiang
Download PDF data sheet
Particulars
Owner: unknown
Designer: Institute of Hydropower Design, Rongzhou City
Contractor: Headquarters of Water Resources and Civil Engineering, Lanshan City
Statistics
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 2 m3x106
Height: 45 metres
Length: 150 metres
Volume of RCC: unknown
Total volume: 45 m3x103
Construction Dates
Start of Project: —/92 (— 1992)
Start of RCC: —/93 (— 1993)
End of RCC: —/94 (— 1994)
End of Project: —/95 (— 1995)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |